Draft Rules and Regulations of the Planning Board as Site Plan Review Authority
The draft text is marked in red. It includes additional requirements for Large Scale Ground Mounted Solar Photovoltaic Installations
Posted on: September 22, 2020 - 8:17am
Attachment | Size |
---|---|
draft_rulesandregs_siteplanrev_11-6-2020.pdf | 330.33 KB |