save
as MS-Excel |
Fee Amount |
Fee Extra |
Minimum |
Administrative Services
Demolition permit approval Field staff to shut-off at the curb-stop and pull the meter, office staff to change customer account and fax paperwork |
$60.00 |
|
0 |
Interest on late payments 14% per annum Accruing daily on delinquent accounts starting the first day after the due-date of the bill |
$0.00 |
|
0 |
Property transfer, real estate closing Field staff for final meter read, office staff to change customer account and fax paperwork to various entities |
$85.00 |
|
0 |
|
Returned check fee |
$25.00 |
|
0 |
Construction Inspections
Commercial Developer pays for construction inspection |
$60.00/hr. |
|
0 |
Residential During normal working hours |
$60.00/hr. |
|
0 |
Cross Connections
Cross connection survey |
$0.00 |
|
0 |
|
Cross connection test, first device |
$60.00 |
|
0 |
|
Cross connection tests, each additional device at same location |
$40.00 per device |
|
0 |
Design Plan Review
Covers additional review of submittal from the third review on |
$3.00 per linear foot |
|
0 |
Initial review and 1st re-submittal Covers initial review, comments, and re-submitted |
$0.00 |
|
0 |
General Labor Rate
One Man/Truck plus materials after normal working hours |
$90.00/hr. |
|
0 |
One Man/Truck plus materials during normal working hours |
$60.00/hr. |
|
0 |
Two Men/One Truck plus materials after normal working hours |
$180.00/hr. |
|
0 |
Two Men/One Truck plus materials during normal working hours |
$95.00/hr. |
|
0 |
Two Men/Two Trucks plus materials after normal working hours |
$215.00/hr. |
|
0 |
Two Men/Two Trucks plus materials during normal working hours |
$150.00/hr. |
|
0 |
Hydrants
1" meter Will be refunded in total if meter is returned undamaged |
$500.00 |
|
0 |
2" meter Cost of reapir or replacement will be deducted from deposit before return |
$3,000.00 |
|
0 |
Hydrant Fire Flow Tests During normal working hours; requestor of test must supply all needed equipment |
$100.00 per set of hydrants |
|
0 |
Hydrant Meter Deposit Covers the cost of replacement of hydrant meter |
$1,000.00 |
|
0 |
Hydrant Meters per day for every day used |
$15.00 |
|
0 |
Labor to remove Hydrant Meter during normal working hours |
$50.00 |
|
0 |
Labor to set Hydrant Meter during normal working hours |
$50.00 |
|
0 |
Meters
Frozen meter charges |
$60.00 plus parts |
|
0 |
Labor to Set New Meter During normal working hours, field staff to set and read the meter, office staff to set-up customer account |
$60.00 |
|
0 |
Meter set and remote, materials Price Varies Cost is dependent on size of service and meter |
$0.00 |
|
0 |
Meter test by customer request If meter is correct (97-103% accuracy) |
$50.00 |
|
0 |
Meter test by customer request If meter is deficient, pro-rated billing reimbursement or additional charges will be billed |
$0.00 |
|
0 |
New Meter Price Varies Cost is dependent on size of meter, ownership will resident with the Water System |
$0.00 |
|
0 |
Miscellaneous Services
Customer Requested Sample Sample specific fee to recover cost of test and labor |
$0.00 |
|
0 |
New Service
SDC 1" System Development Charge based on 1 inch service line Plus inter-municipal agreement charge |
$1,900.00 |
|
0 |
SDC 1.5" System Development Charge based on 1.5 inch service line Plus inter-municipal agreement charge |
$2,850.00 |
|
0 |
SDC 2" System Development Charge based on 2 inch service line Plus inter-municipal agreement charge |
$3,800.00 |
|
0 |
SDC 4" System Development Charge based on 4 inch service line Plus inter-municipal agreement charge |
$15,000.00 |
|
0 |
SDC 6" System Development Charge based on 6 inch service line Plus inter-municipal agreement charge |
$24,000.00 |
|
0 |
SDC 8" System Development Charge based on 8 inch service line Plus inter-municipal agreement charge |
$31,000.00 |
|
0 |
SDC Above 8" Special Permit required |
$0.00 |
|
0 |
Tapping Fee Plus all costs necessary for infrastructure improvement, plus intermunicipal agreement charges. A fee charged to tap into a water-main for all new and existing users |
$700.00 per inch |
|
0 |
Regular Fees
Per meter per day (for the up-keep of meters, meter reader, and equipment) |
$0.15 |
|
0 |
|
Per quarter for the first five ccu's |
$25.00 |
|
0 |
Requested Turn On or Off
After normal working hours |
$150.00 |
|
0 |
|
During normal working hours |
$50.00 |
|
0 |
Water Permit Cost
Commercial |
$400.00 |
|
0 |
|
Industrial |
$600.00 |
|
0 |
|
Residential |
$200.00 |
|
0 |